Set Designer Estimate Template (Free)

Set designers send estimates after a script read, a concept meeting, or a creative brief, and before any drawings or purchasing begin. Clients usually compare your design fee, the total build and materials budget, and how much of the work you manage yourself against other designers or in-house art departments. A clear quote also sets the design budget the director or producer will be working to.

AI Voice CommandsPDF ExportReal-time PreviewConvert to InvoicePrivacy First

When to use estimates: Use estimates to provide project quotes and get client approval before starting work. Once approved, convert your estimate to an invoice with one click to collect payment.

Estimate Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Estimate Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

What to include in your Set Designer quote

  • Deliverables: sketches, renderings, models, drawings, paint elevations

    Clients often assume different levels of documentation, and each deliverable takes a different amount of time.

  • Number of sets, locations, or scenes covered

    Adding a scene or a second location mid-project changes the workload, and the quote should show the baseline.

  • Build budget and who controls it

    Stating whether materials, fabrication, and rentals are inside your fee, in a separate client-held budget, or billed as reimbursables prevents surprises.

  • Revision rounds included and the rate for extra rounds

    Directors and clients often change their minds, so set a limit before the first concept meeting.

  • Schedule: concept due, design approval, build dates, load-in, strike

    Compressed timelines and late approvals are the main reason jobs go over, and a schedule gives you grounds for rush fees.

  • Services excluded: scenic painting, fabrication, installation, strike, storage

    Clients may assume you handle the build; listing what you do not do avoids unpaid work.

  • Usage rights and ownership of drawings

    Defining whether the client is licensed for one production or may reuse the design avoids later disputes.

Set Designer rates to quote from

ServicePricedTypical range
Theater set design (small to mid-size production)flat fee per production$1,500-6,000
Commercial or photo shoot set designper day$450-1,200
Film/TV art department prep and shoot (independent productions)per day$400-900
Concept sketches, renderings, and 3D modelsper hour$50-110
Technical drawings and build packages (CAD/Vectorworks)per hour$55-100
Event or trade show environment designflat fee per project$1,000-5,000
Prop and décor sourcing or shoppingper hour$35-75
Build management and on-site installation supervisionper day$350-800

Typical US ranges. Rates vary by region, experience, and job size.

Pricing your quotes

Build the quote from days and hours, then cross-check

Estimate the hours for concept, drawings, sourcing, and on-site days, then compare the total to the typical flat fee for that kind of production. If the two numbers are far apart, adjust your scope or your price.

Quote the design fee and the build estimate separately

Give the client one figure for your creative work and another estimate for materials and fabrication. This lets them cut build costs without cutting your fee, and shows where the money goes.

Add a contingency line

Include 10-15% for unforeseen changes in materials pricing, last-minute script revisions, or venue constraints. Say that unused contingency is not billed.

Offer tiers for tight budgets

Present a basic option (drawings only), a standard option (drawings plus sourcing), and a full option (design plus build supervision). Clients with limited budgets can choose what to keep.

Set Designer estimate FAQ

Should I charge for an estimate or pitch?

A brief conversation and a rough quote are normally free. If a client wants concept sketches, a mood board, or a rendering to pitch to their own client, charge a pitch or concept fee, and credit it toward the full fee if you get the job.

How long should a quote stay valid?

Thirty days is common. Lumber, fabric, and rental pricing change, and production calendars fill up, so state an expiration date and note that dates are held only after a deposit.

What happens if the script or scope changes after the quote is accepted?

Include a change clause stating that significant changes, such as added sets, a new venue, or major revisions after design approval, will be re-quoted or billed hourly. Send a short written change order before doing the extra work.

How do I quote when the budget is not set yet?

Ask for a range or a target build budget before you quote, since set design scales with it. If the client cannot say, give your design fee as a fixed number and the build as a rough estimate with a note that it will be updated after design approval.

Job done and ready to bill?

Use the Set Designer invoice template to bill the client, or convert this estimate once it's approved.

Set Designer invoice template

Related estimate templates