Gutter Installer Invoice Template (Free)

Gutter installers fit new rain gutters, downspouts, and gutter guards on homes and small commercial buildings, and many also repair, replace, and clean existing systems. Most are solo operators or small crews who bill homeowners, property managers, roofers, and general contractors for linear footage of gutter, accessories, and labor.

AI Voice CommandsPDF ExportReal-time PreviewPrivacy First

Invoice Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Invoice Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

How Gutter Installer pricing works

Most gutter work is priced per linear foot installed, with the price depending on material (aluminum, steel, copper, vinyl), size (5-inch or 6-inch), and gauge. Downspouts are usually priced per foot or per piece, and corners, end caps, and outlets are either built into the per-foot price or itemized. Gutter guards, cleaning, and repairs are priced separately, with repairs often charged as a minimum service fee or hourly. Many installers form seamless gutters on site from coil stock, so the per-foot rate covers material, machine time, hangers, sealant, and labor. Add-ons like fascia repair, difficult access (three stories, steep roofs), and haul-away of old gutters are billed as separate lines. Most jobs are quoted as a flat total based on measured footage, then invoiced to match the accepted quote plus any approved changes.

ServicePricedTypical range
Seamless aluminum gutters, 5-inch, installedper linear foot$7-12
Seamless aluminum gutters, 6-inch, installedper linear foot$9-15
Copper or heavy-gauge steel gutters, installedper linear foot$20-40
Downspouts, aluminum, installedper linear foot$6-10
Gutter guards or leaf screens, installedper linear foot$5-15
Gutter cleaning, single-story homeflat fee$100-200
Gutter repair (reseal, rehang, replace section)minimum service fee$150-300
Removal and haul-away of old guttersper linear foot$1-3

Typical US ranges. Rates vary by region, experience, and job size.

Sample Gutter Installer invoice

DescriptionQtyRateAmount
Seamless 5-inch white aluminum gutters, formed on site and installed with hidden hangers160 linear ft$9.50$1,520.00
2x3 aluminum downspouts with elbows and brackets60 linear ft$7.50$450.00
Inside/outside corners and end caps with sealant6 each$18.00$108.00
Remove and haul away existing gutters160 linear ft$1.50$240.00
Splash blocks4 each$12.00$48.00
Replace rotted fascia board section, 12 ft1 flat fee$145.00$145.00
Total$2,511.00

Notes: Total matches accepted quote dated May 2 plus approved fascia repair. Balance due within 7 days of completion. Workmanship warranty: 2 years on installation, against leaks at seams and loose hangers. Material warranty per manufacturer. Checks payable to the business name above; card payments accepted.

What to include on your Gutter Installer invoice

  • Total linear footage by gutter size and material

    Footage is the main pricing driver, so showing it lets the client match the invoice to the quote and settles later disputes about how much was installed.

  • Gutter profile, color, and gauge

    K-style versus half-round, white versus bronze, and .027 versus .032 gauge all change cost. Listing them proves the client got what they chose.

  • Downspout count, size, and placement notes

    Downspouts are easy to dispute. Note the number and size, and any extras added during the job.

  • Accessories and add-ons itemized

    Guards, splash blocks, hidden hangers, and fascia repair are often agreed verbally on site. Listing them separately shows what was approved.

  • Reference to the original quote and any change orders

    Ties the invoice to the agreed scope and explains any difference in total.

  • Job site address and completion date

    Many clients are landlords, property managers, or buyers paying for a different address than their billing address. The date starts the warranty period and payment clock.

  • License or registration number, where required

    Some states and cities require contractor or home improvement registration to appear on contracts and invoices. Check your local rules.

  • Warranty terms

    Stating what is covered and for how long reduces callbacks about issues outside your workmanship, like clogging or ice damage.

Payment terms

Gutter jobs are short, often one day, so terms are tight. Many installers take a deposit of 20-50 percent when the client accepts the quote, mainly to cover material coil and color orders, with the balance due on completion or within 7 days. Jobs for roofers and contractors are more often net 15 or net 30. Common payment methods are check, card, and bank transfer. Late fees of 1-1.5 percent per month are common on commercial accounts, but state them on the quote and invoice up front, and check your state's rules on late fees and deposit limits for home improvement work.

Billing tips

Measure and record footage before you quote

Walk the house and write down each run. A 10-foot error on a 160-foot job is real money at $9 a foot. Keep those measurements with the job so the invoice footage can be verified.

Charge a minimum for small repairs

A reseal or a single downspout swap takes a truck trip, ladder setup, and cleanup. Use a minimum service fee so a 20-minute fix does not cost you the afternoon.

Bill access and height as separate lines

Three-story homes, steep roofs, and jobs needing a lift or extra ladders take longer and carry more risk. A line for high-access work is easier for clients to accept than a higher base rate.

Pass on material price swings with a quote expiry

Aluminum coil and guard prices move. Put a validity period of 15 to 30 days on quotes so you are not locked into old pricing.

Photograph the finished work before you leave

Photos of seams, hangers, downspout outlets, and discharge points help if a client later claims a leak or damage and support your invoice if a payment is questioned.

Gutter Installer invoice FAQ

Should I charge per foot or per hour for gutter installation?

Per linear foot is standard for installation because clients can compare quotes easily and it rewards an efficient crew. Hourly billing is more common for repairs, cleaning add-ons, and unusual jobs where scope is unclear.

Do I charge sales tax on gutter installation?

It depends on your state. In many states, installation labor on a real property improvement is not taxed, while the contractor pays sales tax on materials, but some states tax the whole job or only certain parts. Check with your state revenue department or an accountant.

How do I invoice a roofer or general contractor who hired me as a subcontractor?

Reference their job number or purchase order, list footage and materials, and follow the payment terms in your subcontract. Many contractors pay net 15 to net 30 and may request lien waivers, so keep your paperwork current.

Can I ask for a deposit on a gutter job?

Yes, and it is common, especially when you order custom-colored coil or specialty materials. Many states limit deposit amounts for home improvement contracts, so check your local rules and state the deposit on the quote.

What if the client wants to add downspouts or guards mid-job?

Write the change down, give a price, and get the client to approve it by text or signature before you do the work. Then list it as a separate line on the invoice.

Quoting a job first?

Send a Gutter Installer estimate for approval, then turn it into an invoice when the work is done.

Gutter Installer estimate template

Related invoice templates