Renovation Invoice Template (Free)

Renovation contractors, remodelers, and small renovation firms send invoices for kitchen, bathroom, basement, and whole-room remodels, as well as additions and repairs to existing homes. Most bills combine labor, materials, subcontractor work, permits, and debris removal, often split into several payments over the life of the job.

AI Voice CommandsPDF ExportReal-time PreviewPrivacy First

Invoice Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Invoice Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

How Renovation pricing works

Renovation work is priced several ways. Fixed-price (lump sum) contracts are common for defined scopes like a bathroom remodel, and are usually billed in milestone draws tied to stages such as demolition, rough-in, drywall, and finish. Cost-plus contracts bill actual materials, labor, and subcontractor costs plus a markup, typically 10-25 percent, or a management fee. Time and materials is used for repairs, small jobs, and unknowns found behind walls, with hourly labor rates plus materials at cost with markup. Some contractors quote per square foot for rough budgeting, but the invoice should still list actual work. Change orders are billed separately and need written approval. Subcontractors such as electricians, plumbers, and tile setters are either passed through with markup or bundled into the contract price.

ServicePricedTypical range
General renovation labor (lead carpenter)per hour$60-120
Helper or laborerper hour$35-65
Bathroom remodel (full, mid-range)flat fee$12,000-35,000
Kitchen remodel (mid-range, labor and materials)flat fee$25,000-75,000
Interior demolition and haul-awayper sq ft$2-8
Drywall install and finishper sq ft$2-4
Tile installation (labor only)per sq ft$8-20
Dumpster rental and disposalper load$400-900

Typical US ranges. Rates vary by region, experience, and job size.

Sample Renovation invoice

DescriptionQtyRateAmount
Demolition of existing bathroom: fixtures, tile, vanity, and flooring removed1 flat fee$1,800.00$1,800.00
Drywall and cement board install and finish (60 sq ft shower and wall areas)120 sq ft$3.25$390.00
Floor and shower tile installation, labor only110 sq ft$14.00$1,540.00
Carpentry and finish labor (trim, vanity install, door)16 hours$75.00$1,200.00
Materials: tile, thinset, grout, backer board, vanity, fixtures (receipts attached)1 lot$3,850.00$3,850.00
Dumpster rental and disposal1 load$550.00$550.00
Total$9,330.00

Notes: Milestone 3 of 4: tile and finish work complete. Balance of 10% due on final walkthrough and punch list completion. Payment due within 7 days of invoice date. Checks payable to the business name above. Any additional work requires a signed change order.

What to include on your Renovation invoice

  • Contractor license number and business name

    Many states require a contractor license number on contracts and sometimes on invoices, and clients use it to verify you.

  • Project address and contract reference

    Ties the invoice to the specific job and signed contract, which matters when you have several jobs for the same client.

  • Milestone or draw description with percent complete

    Shows why this payment is due and keeps the draw schedule consistent with the contract.

  • Itemized materials with receipts or supplier names

    Cost-plus and time-and-materials clients expect proof of cost, and it reduces disputes about markup.

  • Approved change orders listed separately with number and date

    Keeps extras distinct from the base contract price and shows written client approval.

  • Subcontractor charges and permit fees

    Lets the client see pass-through costs, and permit fees are often reimbursable at cost.

  • Running contract total, paid to date, and balance remaining

    Avoids confusion over how much has been paid and what is still owed across multiple draws.

Payment terms

Renovation contractors commonly take a deposit at signing, often 10-30 percent, though some states cap deposits on home improvement contracts, so check your local rules. The rest is billed in progress payments tied to milestones, with due dates of 3-10 days. Final payment is usually held until the punch list is done and a walkthrough is complete. Late fees of 1-1.5 percent per month are common if stated in the contract. Payment is typically accepted by check, ACH, or card, and card fees are often passed on or avoided on large invoices. Keep lien rights in mind: in many states you must send preliminary notices and file lien waivers, so confirm the deadlines where you work.

Billing tips

Tie draws to finished work, not dates

Billing at completed stages like demo, rough-in passed inspection, and drywall done keeps you from being ahead of the money while staying fair to the client.

Bill change orders immediately

Hidden rot, outdated wiring, and client upgrades are the main source of unpaid extras. Get a signed change order before doing the work and invoice it with the next draw.

Collect lien waivers as you pay

Provide conditional and unconditional waivers where your state uses them, and get them from subs and suppliers so the client and lender stay comfortable.

Pass through materials with receipts

For large purchases like cabinets, windows, or tile, invoice them at order or delivery so you are not financing the client's materials.

Keep final payment tied to a written punch list

Agree on the list before the final walkthrough so the last payment is not held up by new requests.

Renovation invoice FAQ

How much deposit can I ask for on a renovation?

Many contractors ask for 10-30 percent, but some states limit home improvement deposits to a set percentage or a fixed dollar amount. Check your state's contractor licensing rules before setting the deposit.

Should I bill renovation work weekly or by milestone?

Fixed-price jobs usually use milestone draws written into the contract. Time-and-materials and cost-plus jobs are often billed weekly or biweekly because costs change as the work goes on.

How do I invoice for extra work found during demolition?

Write up a change order describing the problem, the added cost, and any schedule impact, and have the client sign before you proceed. Then list it as its own line on the next invoice with the change order number.

Can I charge a markup on materials and subs?

Yes, if it is stated in your contract. Cost-plus contracts typically list the markup percentage, often 10-25 percent, and should say whether it applies to materials, subs, or both.

What if a client withholds the final payment?

Refer to the contract and the punch list first. If the work is complete, send a written demand, and consider your lien rights, which in many states have strict deadlines. A local attorney can advise on your options.

Quoting a job first?

Send a Renovation estimate for approval, then turn it into an invoice when the work is done.

Renovation estimate template

Related invoice templates