General Contractor Estimate Template (Free)

General contractors send written estimates or bids before work begins, usually after a site visit and often alongside two or three competing bids. Homeowners compare total price, but also scope, allowances, schedule, and who handles permits. A clear estimate sets up the contract and prevents the "I thought that was included" argument later.

AI Voice CommandsPDF ExportReal-time PreviewConvert to InvoicePrivacy First

When to use estimates: Use estimates to provide project quotes and get client approval before starting work. Once approved, convert your estimate to an invoice with one click to collect payment.

Estimate Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Estimate Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

What to include in your General Contractor quote

  • Detailed scope of work by room or phase

    Specific descriptions such as 'demo existing cabinets, install new base and wall cabinets' make it clear what is and is not included.

  • Materials and allowances

    If the client picks fixtures, tile, or appliances later, set a dollar allowance for each. Overages become a change order, not a surprise.

  • Exclusions

    List what you are not doing, such as painting, flooring, appliance purchase, or hazardous material abatement, so the client does not assume it is covered.

  • Permits, inspections, and who pulls them

    Permit fees and the time to handle them are real costs. State whether fees are included or passed through at cost.

  • Payment schedule

    Spell out the deposit and draws so the client knows when money is due and what milestones trigger each payment.

  • Timeline with start and estimated completion

    Give a realistic range and note delays that are outside your control, like weather, inspections, and material lead times.

  • Unforeseen conditions clause

    Rot, old wiring, asbestos, and code upgrades are often found after demo. State how hidden conditions will be priced and approved.

General Contractor rates to quote from

ServicePricedTypical range
General contractor labor (small jobs, T&M)per hour$55-125
Project management / supervision (cost-plus)percent of cost10-25%
Kitchen remodel (mid-range)flat fee$25,000-75,000
Bathroom remodelflat fee$10,000-30,000
Room additionper sq ft$150-350
Deck construction (wood)per sq ft$30-65
Interior painting (labor and materials)per sq ft of floor area$2-6
Permit handling and coordinationflat fee$250-1,000

Typical US ranges. Rates vary by region, experience, and job size.

Pricing your quotes

Build up costs line by line

Price labor, materials, subcontractors, permits, dumpsters, and equipment separately, then add overhead and profit. Per-square-foot numbers are good for a first conversation but weak for a final bid.

Get written sub quotes and add a contingency

Base your bid on current subcontractor and supplier quotes, and include a 5-10 percent contingency on remodels where walls are closed. Material prices move, so state how long the quote is valid.

Offer options instead of discounting

Present a base scope with priced add-ons or alternates, such as upgraded countertops. Clients can adjust the budget without you cutting margin.

Charge for detailed design-phase estimates on big jobs

For major projects, a paid preconstruction or design-phase fee, credited toward the contract, protects your time from bid shoppers.

General Contractor estimate FAQ

Should I charge for estimates?

Many contractors offer free estimates on small and mid-size jobs. For large remodels or when detailed plans, engineering, or multiple revisions are needed, a paid estimate or preconstruction fee is common and often credited to the contract if the client proceeds.

How long should an estimate be valid?

Usually 14-30 days. Material costs and sub availability change, so state an expiration date and note that pricing may be adjusted after that.

What is the difference between an estimate and a fixed bid?

A fixed bid commits to a total price for a defined scope. An estimate is an approximate cost that may change as scope or conditions change. Label the document clearly so the client knows which one they are getting.

What happens if the final cost goes over my estimate?

If the contract is fixed-price, overruns from your own errors are yours to absorb, while client-requested changes and unforeseen conditions are handled through written change orders. On cost-plus jobs, give a not-to-exceed figure or regular cost updates so the client is not surprised.

Job done and ready to bill?

Use the General Contractor invoice template to bill the client, or convert this estimate once it's approved.