Generator Installation Estimate Template (Free)

Generator installers send a written estimate after a site visit, and often the client collects two or three to compare. Clients look at brand and kW size, what the transfer switch covers, gas versus propane, and who handles permits and the utility. A clear scope separates a fair bid from a low one that leaves out gas work or the pad.

AI Voice CommandsPDF ExportReal-time PreviewConvert to InvoicePrivacy First

When to use estimates: Use estimates to provide project quotes and get client approval before starting work. Once approved, convert your estimate to an invoice with one click to collect payment.

Estimate Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Estimate Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

What to include in your Generator Installation quote

  • Generator brand, model and kW size

    Two bids at different sizes or brands are not comparable, and the load calculation should justify the size you chose.

  • Transfer switch type and what it powers

    Whole-home, service-entrance and selected-circuit setups differ greatly in price and clients often assume more is covered.

  • Fuel connection scope

    State fuel type, pipe material, estimated footage, who supplies the propane tank, and whether a meter or regulator upgrade is needed from the utility.

  • Location and distance assumptions

    Pad location, setbacks and distances to the panel and gas meter drive trenching and wiring costs. Note the assumed footage so overages are clear.

  • Permits, inspections and HOA approvals

    Say who pulls permits and who pays fees, and note that HOA or utility approval timelines can delay the start.

  • Exclusions

    List items such as panel upgrades, rock excavation, landscaping repair, tree removal, driveway or patio cutting and propane fill, which otherwise get assumed as included.

  • Price validity, lead time and payment schedule

    Equipment prices and delivery times change. State how long the quote holds, the expected schedule, and the deposit and progress payments.

Generator Installation rates to quote from

ServicePricedTypical range
Standby generator install labor (residential, 10-24 kW), unit not includedflat fee$3,000-7,500
Generator unit, 22 kW air-cooled (supplied by contractor)each$4,500-7,500
Automatic transfer switch (100-200 amp) supply and installeach$900-2,500
Gas line extension (natural gas or propane), black iron or CSSTper linear foot$15-45
Electrical conduit and wire run, trenching includedper linear foot$20-60
Concrete or composite equipment padflat fee$300-900
Permit and inspection coordinationflat fee$150-600
Electrician or gas fitter labor, service and repairper hour$85-175
Annual maintenance plan (oil, filters, plugs, load test)per visit$200-450

Typical US ranges. Rates vary by region, experience, and job size.

Pricing your quotes

Quote from a load calculation

Size the unit from the panel's actual loads rather than a guess. It supports your price and avoids callbacks for an undersized unit.

Price by the linear foot for variable runs

Include an assumed footage for gas and electrical runs and a per-foot rate for anything beyond it. The client sees how the number was built and overages are simple to explain.

Offer good, better and best options

Present two or three configurations, such as a smaller unit with a selected-circuit switch versus a larger unit with a whole-home switch, so the client chooses a scope rather than a bidder.

Build in lead time and price protection

Set a short validity window, often 14 to 30 days, and say that equipment price changes from the manufacturer may adjust the quote after that.

Generator Installation estimate FAQ

Should I charge for estimates?

Many installers do free site visits for standard residential jobs. Some charge a fee of $100 to $300 for complex or commercial work and credit it toward the job if the client signs.

How firm is a generator quote?

A flat quote holds for the stated scope and assumptions. Anything outside it, like extra footage or rock, is handled by change order. Write that into the estimate.

How long should a quote stay valid?

Typically 14 to 30 days. Equipment costs and availability can shift, so a short window protects you.

Can the estimate become the contract?

Yes, if it includes scope, price, payment schedule and signature lines and meets your state's contractor requirements. Many states require specific language, such as cancellation rights or license numbers, so check local rules.

Job done and ready to bill?

Use the Generator Installation invoice template to bill the client, or convert this estimate once it's approved.

Generator Installation invoice template

Related estimate templates