Demolition Invoice Template (Free)

Demolition contractors tear down or strip out structures, interiors, and site features so something else can be built or so a space can be cleared. Solo operators and small crews bill for interior gut-outs, selective demo, full structure teardown, concrete removal, and hauling debris. Invoices usually combine labor, equipment, disposal fees, and permits into one job total or a progress billing schedule.

AI Voice CommandsPDF ExportReal-time PreviewPrivacy First

Invoice Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Invoice Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

How Demolition pricing works

Most demolition work is priced as a flat fee per job based on a site walkthrough, with the quote built from labor hours, equipment, haul-off, and dump fees. Residential and small commercial jobs are often quoted per square foot (interior gut) or per job (shed, deck, garage, house). Concrete, asphalt, and masonry are commonly priced per square foot by thickness or per cubic yard. Time and materials with a day rate for a crew and machine is common when scope is unclear, such as in older buildings with unknown conditions. Disposal is usually passed through at cost with a markup of 10 to 20 percent, or built into the price. Hazardous material work (asbestos, lead paint) is typically done by licensed abatement firms, so demo contractors either subcontract it or exclude it in writing. Larger jobs bill in stages: a deposit or mobilization fee, progress billings, and a final invoice after debris is gone and the site is cleaned.

ServicePricedTypical range
Interior non-structural demo (drywall, flooring, fixtures)per sq ft$2-6
Full kitchen or bathroom gut-outflat fee$1,500-5,000
Concrete slab or driveway removal and haul-offper sq ft$3-8
Deck, shed, or detached garage demolitionflat fee$1,000-6,000
Full house demolition (residential, no hazmat)per sq ft$8-20
Laborer on a demo crewper hour$40-75
Excavator or skid steer with operatorper hour$125-250
Dumpster rental and disposal (10-30 yard roll-off)per load$400-1,200

Typical US ranges. Rates vary by region, experience, and job size.

Sample Demolition invoice

DescriptionQtyRateAmount
Interior demo of 1,200 sq ft basement: remove drywall, framing (non-structural), flooring, and ceiling1200 sq ft$3.50$4,200.00
Removal of concrete porch slab (4 in thick), break up and load out150 sq ft$5.00$750.00
Skid steer with operator6 hour$140.00$840.00
30-yard roll-off dumpster, delivery, haul, and disposal2 load$725.00$1,450.00
Demolition permit fee (pass-through)1 flat fee$150.00$150.00
Total$7,390.00

Notes: Payment due within 15 days of invoice date. Deposit of $2,500 received on 03/04 has been applied. Scope excludes asbestos or lead abatement and any structural repairs. Dump receipts available on request. A 1.5% monthly fee applies to balances past due.

What to include on your Demolition invoice

  • Job site address and permit number

    Ties the invoice to the exact property and shows the work was permitted, which owners and lenders often need for their records.

  • Contractor license number and insurance info

    Many states and cities require a license number on contracts and invoices, and general contractors and property managers often ask for proof of coverage.

  • Itemized scope by area or phase

    Separating interior demo, concrete removal, and site cleanup makes it clear what was done and avoids arguments over what was included.

  • Disposal costs with ticket or weight details

    Dump fees vary by weight and material type. Showing tons or loads justifies the charge and supports any markup.

  • Equipment hours and operator time

    Machine time is a major cost. Listing the machine, hours, and rate keeps the charge defensible.

  • Change orders and extra work found during demo

    Hidden conditions like extra layers of flooring, buried tanks, or rot are common. Written approvals referenced on the invoice prevent disputes.

  • Deposits and progress payments already received

    Shows the balance due clearly and prevents double billing on larger jobs.

Payment terms

For small residential jobs, many demolition contractors collect a deposit of 25 to 50 percent at booking to cover dumpster rental and mobilization, with the balance due on completion. Larger commercial and multi-week jobs usually use progress billing every two weeks or monthly, with net 15 or net 30 terms. Final payment is often tied to site cleanup and, where required, a final inspection. Late fees of 1.5 percent per month are common if stated in the contract. Checks, ACH, and card payments are all accepted, and card fees are sometimes passed on for large balances. Check your state's rules on lien rights and notice deadlines, since preliminary or lien notices can affect how you get paid on commercial work.

Billing tips

Collect a deposit that covers your out-of-pocket costs

Dumpsters, permits, fuel, and equipment rental come due before you are paid. A deposit sized to cover those costs protects you if the client delays or cancels.

Write exclusions into the quote and repeat them on the invoice

State that hazardous materials, structural repairs, utility disconnects, and hidden conditions are not included. If you find asbestos or a buried oil tank, the paper trail supports a change order.

Keep every dump ticket

Landfills charge by weight and may change rates. Tickets let you bill disposal accurately and answer questions from clients or their accountants.

Bill extra work as it happens

Get written or texted approval for added scope on the day it comes up and list it as a separate line. Rolling it into the final bill later invites pushback.

Bill in stages on multi-week jobs

Invoice after teardown, after hauling, and after final grading or cleanup. Staged billing keeps cash flowing and limits how much unpaid work you carry.

Demolition invoice FAQ

Should I charge per square foot or per job?

Per square foot works well for interior gut-outs and slabs where the scope is easy to measure. Flat per-job pricing is better for sheds, decks, and garages. Use time and materials when conditions are unknown, and put a day rate and machine rate in writing.

How do I bill for disposal?

Either include it in your price or list it as a separate line at cost plus a markup of 10 to 20 percent. Separate lines are clearer when weight is uncertain, and you can attach dump tickets as backup.

Do I charge for the permit on my invoice?

If you pull the permit, list the fee as a pass-through line and add a small handling charge if your contract allows it. Permit rules vary by city and county, so confirm who is responsible before quoting.

What if I find asbestos or lead paint mid-job?

Stop work in the affected area and notify the client in writing. Testing and abatement generally must be done by licensed professionals, and rules vary by state. Bill your standby or remobilization time under your change order terms.

Can I put a lien on a property if I am not paid?

In many states, contractors who improve or prepare property can file a mechanic's lien, but deadlines and notice requirements vary and are strict. Check your state's rules or ask a local attorney, and keep your invoices and contract details organized.

Quoting a job first?

Send a Demolition estimate for approval, then turn it into an invoice when the work is done.

Demolition estimate template

Related invoice templates