Excavation Invoice Template (Free)

Excavation contractors dig, grade, and move earth for home builders, property owners, and other trades. Typical invoices cover equipment time with an operator, hauling and dump fees, trenching for utilities, foundation and basement digs, septic installs, and site grading. Most are owner-operators or small crews with a few machines and trucks.

AI Voice CommandsPDF ExportReal-time PreviewPrivacy First

Invoice Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Invoice Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

How Excavation pricing works

Excavation is priced either by the hour for machine and operator, or as a flat bid for a defined scope. Hourly rates are common for small jobs, repairs, and work with unknown conditions, and are usually quoted per machine (mini excavator, backhoe, skid steer, dozer) with a minimum, often 3 to 4 hours. Larger jobs such as basement digs, septic systems, and driveways are often bid as a lump sum or by unit, such as per cubic yard, per linear foot of trench, or per load hauled. Trucking is billed per hour or per load, and fill, gravel, and topsoil are billed per ton or per yard with a markup. Add mobilization (lowboy transport) as its own line, plus dump or disposal fees at cost plus a handling charge. Rock, groundwater, and buried debris are normally excluded from fixed bids and billed as extras at your hourly rate.

ServicePricedTypical range
Mini excavator with operatorper hour$100-160
Backhoe or full-size excavator with operatorper hour$125-220
Skid steer or dozer with operator (grading)per hour$90-175
Dump truck with driver (tandem or tri-axle)per hour$90-150
Equipment mobilization (lowboy delivery)flat fee per move$150-600
Utility trenching (water, electric, drain)per linear foot$5-25
Basement or foundation excavationflat fee$2,500-8,000
Septic system excavation and install laborflat fee$3,000-9,000

Typical US ranges. Rates vary by region, experience, and job size.

Sample Excavation invoice

DescriptionQtyRateAmount
Mobilize mini excavator and trailer to job site (round trip)1 flat fee$250.00$250.00
Mini excavator with operator, trench for water line and electrical conduit, 4 hr minimum applied8 hours$130.00$1,040.00
Dump truck with driver, haul spoil off site3 hours$115.00$345.00
3/4 inch crushed stone for pipe bedding and backfill, delivered14 tons$32.00$448.00
Dump fee for excess spoil (at cost plus 10%)1 flat fee$165.00$165.00
Extra: removal of buried concrete slab found in trench path, approved by owner on site1.5 hours$130.00$195.00
Total$2,443.00

Notes: Payment due within 15 days of invoice date. Balance after the 30% deposit received on 6/3. Extra work approved verbally by owner on 6/5 and listed above. Late balances accrue 1.5% per month. Checks payable to the company name above; ACH and card accepted.

What to include on your Excavation invoice

  • Job site address and lot or permit number

    Excavation is tied to a specific parcel, and the address lets owners, lenders, and inspectors match the invoice to the work.

  • Equipment used, operator, and hours per machine

    Clients dispute machine time more than anything else, so list each machine separately with hours and dates.

  • Mobilization and trucking lines

    Moving equipment and hauling are real costs that clients often forget; separate lines prevent them from being questioned as padding.

  • Materials by type, quantity, and unit (tons or yards)

    Gravel, fill, topsoil, and stone are priced per ton or yard and should match the delivery tickets you can show on request.

  • Dump or disposal fees and scale tickets

    These are pass-through costs, and attaching tickets backs up the amount if the client questions it.

  • Change orders and extras, with date and who approved them

    Rock, buried debris, wet ground, and added trench length are common extras. A written record of approval avoids fights over work outside the original bid.

  • Contractor license number, insurance info, and any permit numbers

    Many states and counties require a license number on contracts and invoices, and general contractors or lenders often request proof of insurance.

Payment terms

Most excavators take a deposit of 25 to 50 percent on larger jobs to cover mobilization and materials, with the balance due on completion or within 7 to 30 days. Small hourly jobs are often paid on the day or within a week. Progress billing is typical for jobs spanning several weeks, such as site prep for a new build, with draws tied to milestones like rough excavation, utilities in, and final grade. Late fees of 1 to 1.5 percent per month are common if stated in writing up front. Checks, ACH, and card are all used; add a card fee only if your state allows it. On commercial and builder work, expect net 30 and possible retainage. Check your state's mechanics lien rules and notice deadlines, since they can protect you if payment stalls.

Billing tips

Set a minimum charge for every machine

Moving a machine on site costs time and fuel even for a one-hour dig. A 3 or 4 hour minimum, written on the quote and invoice, covers that and stops requests for quick favors at a loss.

Bill portal-to-portal when it applies

If your quote says hourly rates run from the time the machine leaves your yard until it returns, say so in writing. Otherwise clients assume billing starts when the bucket hits dirt.

Get change orders signed before you dig

When you hit rock, a buried tank, or soft ground, stop, take a photo, and get a text or signature approving the extra cost. Add it to the invoice with the date.

Keep scale tickets and delivery slips

Photograph every ticket the day you get it. Matching tickets to invoice quantities settles most disputes about tonnage and loads in minutes.

Know your lien deadlines

Many states require a preliminary notice within a set number of days of starting work to keep lien rights. Check your local rules and send notices on builder and commercial jobs even when you expect to be paid.

Excavation invoice FAQ

Should I bill excavation by the hour or as a flat fee?

Use hourly when conditions are unknown, such as repair work, old lots, or clearing, and use a flat fee when the scope is clear and you can see the site, such as a standard basement dig or driveway. Many contractors bid flat but list hourly rates for extras like rock or extra hauling.

Can I charge for equipment travel time?

Yes. Mobilization is normally billed as a separate line for lowboy delivery, or as hourly time from yard to site. State it in your quote so the client agrees to it before the job.

How do I bill for hauling and dump fees?

List trucking by the hour or load, and list dump fees as a separate line at cost, often with a 10 to 15 percent handling markup. Keep scale tickets so you can show the actual cost.

How do I handle unexpected rock or buried debris?

Exclude it from fixed bids in writing and bill it at your hourly rate with any needed rock breaker or hammer attachment. When you find it, document with photos and get the client's approval before continuing.

Do I charge sales tax on excavation?

It depends on the state. Some tax materials like gravel and fill, some tax certain construction services, and many exempt labor. Check with your state revenue department or an accountant, and show tax on a separate line when required.

Quoting a job first?

Send a Excavation estimate for approval, then turn it into an invoice when the work is done.

Excavation estimate template

Related invoice templates