Excavation Estimate Template (Free)

Excavation contractors give estimates before any digging starts, usually after a site visit. Clients often compare several bids, so the scope, what is excluded, and how unknowns are handled matter as much as the total price.

AI Voice CommandsPDF ExportReal-time PreviewConvert to InvoicePrivacy First

When to use estimates: Use estimates to provide project quotes and get client approval before starting work. Once approved, convert your estimate to an invoice with one click to collect payment.

Estimate Editor

Fill in details

Create an invoice for payment collection

Your Information

Upload logo

Bill To
Invoice Details
Line Items
Item 1
Amount: $0.00
Tax & Discount
Additional Information
Payment Collection
Loading payment settings...

PDF will be generated with filename:
Invoice_1001_Client_2026-10-14.pdf

Estimate Preview

Style:
Live Preview

INVOICE

#1001
$0.00
Due:

From

Your Business Name

Bill To

Client Name
Invoice Date
Due Date
Description
Qty
Rate
Amount
Description
1
$0.00
$0.00
Subtotal:$0.00
Total:$0.00

Terms & Conditions

Payment is due within 30 days of invoice date.

What to include in your Excavation quote

  • Exact scope and dimensions

    State the depth, width, length, or square footage, such as a 24 by 36 foot basement at 8 feet deep. Vague scope leads to disputes over what was included.

  • Spoil handling: haul off, stockpile, or spread on site

    Hauling dirt away adds trucking and dump fees. Clients often assume it is included unless you say otherwise.

  • Materials included and who supplies them

    Specify gravel, fill, topsoil, pipe bedding, and quantities, and say whether you or the client buys them.

  • Exclusions for rock, groundwater, and buried objects

    These are the biggest sources of cost overruns. State that they are billed as extras at your hourly rate.

  • Permits, utility locates, and survey stakes

    Say who gets the permit and who calls for utility marking (811 in the US). Digging without locates creates serious liability.

  • Site access, restoration, and erosion control

    Note what happens to lawns, driveways, and silt fence, and whether restoration like seeding or regrading is included.

  • Start window, weather delays, and quote expiration date

    Fuel, material, and schedule changes affect cost. A 30-day expiration and weather language protect you.

Excavation rates to quote from

ServicePricedTypical range
Mini excavator with operatorper hour$100-160
Backhoe or full-size excavator with operatorper hour$125-220
Skid steer or dozer with operator (grading)per hour$90-175
Dump truck with driver (tandem or tri-axle)per hour$90-150
Equipment mobilization (lowboy delivery)flat fee per move$150-600
Utility trenching (water, electric, drain)per linear foot$5-25
Basement or foundation excavationflat fee$2,500-8,000
Septic system excavation and install laborflat fee$3,000-9,000

Typical US ranges. Rates vary by region, experience, and job size.

Pricing your quotes

Visit the site before quoting

Look at access, soil, slope, nearby utilities, and where spoil can go. A 20-minute walk-through catches problems that change the price by thousands.

Build the bid from machine hours plus trucking

Estimate the hours per machine, add mobilization, trucking, materials, and disposal, then add overhead and profit. Include margin for machine wear and repairs, not just fuel and wages.

Use unit prices for uncertain quantities

If you cannot know the amount, offer a rate per cubic yard of fill or per foot of trench with an estimated total. The client sees a clear basis for the final bill.

Separate options and allowances

List add-ons such as finish grading, extra stone, or stump removal as options. For items with unknown cost, such as rock removal, list an allowance and say how overages are billed.

Excavation estimate FAQ

Should I charge for estimates?

Free estimates are standard for typical residential jobs. For large site work that needs plan review or engineering input, many contractors charge a fee and credit it toward the job if awarded.

How long should an excavation quote stay valid?

Usually 15 to 30 days. Fuel, trucking, and material costs change, and your schedule fills up, so put an expiration date on the quote.

What deposit should I ask for on an estimate?

Many excavators ask for 25 to 50 percent on larger jobs to cover mobilization and materials. On small hourly jobs, no deposit is common. State the amount and due date on the quote.

What if the final cost goes over my estimate?

For a fixed bid, you absorb normal variation but can bill extras that are excluded in writing, like rock or extra hauling. For an hourly estimate, say it is an estimate and that you will notify the client if hours will go meaningfully over.